Norlan vs the copilot in your CMMS
Your CMMS copilot knows the work order. Norlan knows how the machine was fixed.
CMMS and EAM vendors are adding assistants over the records they already hold: work orders, planning, assets, compliance. That is the right place for them. Norlan sits on the machine, where the fault is worked out, and keeps the reasoning the work order never held.
False rejects after a format change
Metal detector MD-3000 · Berlin
T. Walker · Maintenance
“So it was the belt, erm… it went slack after the format change. Re-tensioned it and checked the K5 was seated — no, sorry, the K4. Ran twenty packs, none rejected.”
Norlan proposes the closure from the thread
- Problem
- False rejects on good packs after every format change: the detector rejects roughly one in forty within the first hour, then settles.
- Cause
- The belt slackens when the format changes and the K4 relay works loose with the vibration, so the reading drifts until it is reseated.
- Solution
- Re-tension the belt to 45 N, reseat the K4 relay and run twenty packs before calibrating. The relay step is not in the manual: it only shows up after a format change on this unit.
Side by side
One answers from the record of what happened. The other keeps why it was closed that way.
| Compared on | the copilot in your CMMS | Norlan |
|---|---|---|
| What it knows | Work orders, planning, asset records and the compliance history already in the system | The machine's record: manuals, closed threads, guides and field notes |
| When nothing was written down | Nothing to answer with: the work order holds the hours, not the reasoning | The thread that solved it is the record; Norlan drafts the guide from it |
| Conversations | Comments on a work order, if anyone writes them | A live thread per incident, with photos and voice, open across shifts until it is solved |
| How far a lesson reaches | That asset's record | Component → unit → model → every equivalent machine, in any plant |
| Who stands behind an answer | The model, over the records it can reach | A cited source and a named person who approved it |
| Who it is built for | The planner and the maintenance manager | The technician at the machine, and the manufacturer when you let them in |
| What it needs before it is useful | Work orders, filled in well | The manuals you already have and one open incident |
| Running a guide | Work steps on the order, where your CMMS has them | Step by step at the machine, with photos and readings where a step needs them |
| Closing an incident | A status, a code and the hours | Proposes problem, cause and fix from the conversation; a technician confirms |
| The manufacturer | Not available | Their engineer joins the thread you invite them to, and sees nothing else |
| Field notes | Not available | What the manual does not say, pinned to the unit and its model |
| Shift handover | Not available | What happened while you were away, from the shift's own activity |
When the copilot in your CMMS is the right choice
Planning, scheduling, spares and compliance — everything that lives in the work order and should. If the question is when a job is due, who is assigned or what a repair cost, the CMMS copilot is where to ask it.
Use both
Product directionThe CMMS keeps the work order and its hours. Norlan keeps the thread where the fault was worked out and what closed it, and can write the closure back so both agree. Nothing is migrated.
Norlan and the copilot in your CMMS: questions we hear
Our CMMS vendor says their AI will do this.
Is it either-or?
Can Norlan open or close work orders?
Book a demo
Bring one work order that closed without saying why. See what the thread would have kept.
We start with the operation — which failures repeat, who gets called when something breaks, what the CMMS does not hold — and then show how Norlan would work on it.
What we usually cover
- How an incident flows today, from detection to fix
- Where the conversation actually happens: the systems, or calls and WhatsApp
- What takes longer — the diagnosis, or getting the right people and information together
- How much of what a technician knows is written down, and what happens when they are away
- Which tools are really in play: CMMS, ERP, mobile, paper
- What a pilot would measure, and how
Pick a time that suits the plant. Bring one failure that keeps coming back.
The call is with the people who build the product, with no qualification call first. Norlan is pre-general-availability and shaped with maintenance teams in pharma and food processing.