Skip to content

Pharma

A failure on qualified equipment is also a deviation.

In a GMP plant the questions arrive after the fact: what happened, what was observed, the root cause, what was done, who verified it and whether it had happened before. Norlan captures those answers at the machine, in the thread and at closure, so the investigation starts from a record rather than from a blank page — and quality decides with it in hand.

Deviation · tablet press TP-30 · unit 1

Maintenance evidence for the investigation

  • What happened, and when

    The thread · opened 02:14 by M. Solans

  • What was observed

    Photo of the tablet press die table · 02:19

  • Root cause

    Closure · dosing cam wear, not the feeder

  • What was done

    Closure · cam replaced like-for-like, P/N on record

  • Who verified it, and when

    T. Walker · on the machine · 03:05

  • Has it happened before

    Model TP-30 · twice, on unit 2 · both closed

  • Impact on the batch

    Quality decides. Not in Norlan.

Written when it happened, by the people who did it.Export

The effectiveness check

Whether the CAPA held is read from the machines, not asserted in a form

A corrective action is closed when it is signed; it is effective when the failure stops coming back. Norlan reads that from the record of every unit of the model: how many times the failure has returned since the fix, on which units, and whether a later closure names a different cause. When one unit comes back with a different root cause, the review sees it before it signs the CAPA off as effective.

  • Occurrences since the fix, per unit of the model, from the closures
  • A later closure that names another cause is shown as such, not folded into the CAPA
  • The fix that held is the one the assistant cites; the one that did not stays visible

Which failure came back, and what held

Effectiveness check · dosing cam wear

Tablet press TP-30 · fix closed 14 Apr · 92 days

Holding on 3 of 4

Occurrences since the fix, by unit

  • Unit 1 · Lyon

    none

  • Unit 2 · Lyon

    none

  • Unit 3 · Basel

    none

  • Unit 4 · Basel

    1 · 3 Jul · closure superseded

Unit 4 came back once. Its closure names a different cause — feeder alignment — so the CAPA is not what failed. Worth a look before the effectiveness review signs it off.

Parts and changes

What changed on a qualified machine, on the record the day it changed

A like-for-like replacement is routine; a new part number on qualified equipment is a change-control question. Closing in Norlan records the part, the number and the person as part of the closure, so the difference is visible the day it happened — not discovered at the next audit. Norlan does not decide whether the change needs requalification; it makes sure quality decides with the record, and that the record was not written afterwards.

  • Part and part number recorded at closure, by the technician who fitted it
  • Like-for-like or not, visible per intervention, per unit
  • Exported to the change-control file; the decision stays with quality

What closing an incident writes

Tablet press TP-30 · unit 4

Parts replaced at closure · this year

WhenPartLike-for-likeByFile
14 AprDosing cam · P/N 4471-CyesT. Walkerexported
02 JunPunch set · station 7yesN. Bermúdezexported
03 JulFeeder drive · P/N 5120-B → 5120-Dno · new P/NM. Solanspending

Norlan records the change. Whether it needs requalification is quality's call, made with the record in hand.

Attribution

Who saw it, who worked it, who was let in from outside

An auditor asks who had access to the record and who wrote what. In Norlan every message is attributed and timestamped, quality can be given read access to the thread of a qualified machine, and the manufacturer's service engineer is admitted to one thread — that one — and revoked at closure. There are no private messages: what was said about the machine is on the machine.

  • Groups and roles per asset: read, take part, or everything
  • The manufacturer's engineer sees the thread they were admitted to, and nothing else
  • Every message with its author and time; no side channel

What this looks like from the manufacturer's side

Who was in the thread

Tablet press TP-30 · unit 1 · 14 Apr

3 groups
  • Maintenance · Lyon

    opened, worked and closed the thread

    Take part
  • Quality · Lyon

    read the closure · 08:10

    Read
  • Manufacturer · service engineer

    admitted 02:31 · answered 02:44 · revoked at closure

    This thread only

Every message attributed and timestamped. No private messages: what was said is on the record.

Where the line is today

Norlan is not a validated system.

It does not generate GMP records, it does not carry electronic signatures under Part 11, and it does not track calibration or qualification status. The QMS and the CMMS keep doing that. Norlan is the maintenance memory next to them: what was done on the machine, by whom, when, and whether it worked, exportable when quality asks. What validating Norlan itself would take in a GxP plant is a conversation for the call, not a claim on a page.

What Norlan connects to, with the state of each one

Questions from pharma plants

Is Norlan a GMP or 21 CFR Part 11 system?

No. It does not generate GMP records, carry Part 11 electronic signatures or replace the QMS. It is the maintenance record of the machine, written when the work happened and attributed to the people who did it. What that record contributes to a deviation file is decided by quality, and whether Norlan needs to be validated as a GxP system in a given plant is a question we answer on the call, in writing, rather than with a badge.

Can quality use a closure in a deviation investigation?

Yes. A closure carries the problem as observed, the root cause, what was done, the part if one was fitted, and who verified it on the machine and when — with the thread behind it: the photos, the voice notes, every message attributed and timestamped. It exports per unit and per window. Impact on the batch is not in Norlan; that assessment stays with quality.

Does Norlan track calibration and qualification status?

No. IQ, OQ and PQ status, calibration due dates and validation expiry stay in the CMMS or the QMS. What Norlan adds is what those systems do not hold: what maintenance actually did on the qualified machine, whether the part was like-for-like, and whether the fix held on every unit of the model afterwards.

What happens with a part that is not like-for-like?

It is on the record as such the day it was fitted — part number, unit, person — and it stands out from the routine replacements around it. Norlan does not raise the change control and does not decide on requalification. It makes sure the change is visible to quality when it happened, not found at the next audit.

How is our operational data handled?

Data is isolated per customer and is not used to train external models. The plant decides what may be read in the first place: filters block documents before anything is indexed.

Book a demo

Bring the last deviation that started from a blank page. We will show what the machine would already have said.

We start with the operation — which failures repeat, who gets called when something breaks, what the CMMS does not hold — and then show how Norlan would work on it.

What we usually cover

  • How an incident flows today, from detection to fix
  • Where the conversation actually happens: the systems, or calls and WhatsApp
  • What takes longer — the diagnosis, or getting the right people and information together
  • How much of what a technician knows is written down, and what happens when they are away
  • Which tools are really in play: CMMS, ERP, mobile, paper
  • What a pilot would measure, and how

Pick a time that suits the plant. Bring one failure that keeps coming back.

The call is with the people who build the product, with no qualification call first. Norlan is pre-general-availability and shaped with maintenance teams in pharma and food processing.