Skip to content

The same standard on every site

The standard lives on the model, not in any one plant.

The same machine runs in Berlin, Munich and Lyon, and each site has its own version of how to fix it. Norlan keeps one, attached to the model, written by the plant that solved it and approved by a person — and keeps the exception on the one unit that really is different, where a corporate procedure would have flattened it.

Checkweigher CW-500

Installed base · Berlin and Munich

BerlinMunichS1-PK-L1-0051S1-PK-L1-0052S1-PK-L2-0018S1-PK-L3-0033S2-PK-L4-0092S2-PK-L4-0093S2-PK-L7-0104S2-PK-L7-0105
MK

M. Keller · Munich · 06:05

Weights drifting since start-up. Static check is fine, it only goes off with the belt running.

The unit of the standard

Written once for the model. Reaches every identical machine, in every site.

Norlan groups the installed base by model wherever the equipment is, so a guide, a field note or a validated cause is attached to the model and every unit has it from the day it is imported — the next line, the other site, the one arriving next year. The fix found on unit three in Berlin is what the technician in Lyon gets cited on unit nine, without anyone in Berlin writing an email about it.

  • Guides, field notes and validated causes live on the model, not on the site
  • A new unit inherits everything the model knows the day it is imported
  • The assistant answers from every unit of the model, in every plant of the group

How every machine learns from the ones like it

S2-PK-L4-0092 · Munich

Checkweigher CW-500 · one of eight units

From the model · every unit has it

Weighs every portion in motion and rejects anything out of range. Drift after pressure washing usually means brine under the load cell: clean before recalibrating.

ManualParts listGuide · Load-cell cleaning

This unit only

Mounted on a vibration-damping base after the 2024 retrofit, with the digital filter at 7. Above 60 packs a minute it needs the belt tension checked first.

Retrofit report · 2024

Where the exception belongs

One unit is different. The standard does not pretend otherwise.

The retrofit on the Munich line, the unit fed from a different silo, the one that runs at a lower speed since the gearbox swap: a corporate procedure has to ignore them or fork. Norlan pins the exception to the unit it is true for. The model keeps the common version, the odd unit keeps its own, and nobody else sees the difference until they are standing at that machine.

  • The exception is pinned to the unit; the model keeps the common version
  • Visible only on that unit's record, cited only when that unit is asked
  • When the retrofit spreads to other units, the exception becomes the standard

How a guide carries version, author and scope

Head shaft seal replacement

Guide · v3 · T. Walker, 2 days ago

Published

Applies to

Rotary filler RF-880

2 units · Berlin Line 2, Munich Line 1

Material and spares

  • Seal 32×47×8 NBR · 4 in stock1
  • Copper washer M8 · 60 in stock2

Who can see it

Maintenance only · 5 people

Last opened by L. Costa, 2 h ago

Versions

  1. v32 days ago · T. Walker

    Warning about the centering pins when removing the housing

  2. v23 weeks ago · N. Bermúdez

    Torque corrected to 12 N·m ± 1

  3. v112 Jun · T. Walker

    First version, drafted from thread #1234

Which way it travels

Up from the plant that solved it. Approved by a person. Dictated by none.

Most multi-site tools ship best practice downwards: one plant, or a central team, writes it and the others comply. Norlan works the other way round, because the knowledge is wherever the failure was last solved. That plant's closure becomes the draft; whoever leads maintenance approves it; the other plants get it as a versioned guide with the author's name, not as a memo. And the next time it is a different plant that finds the better fix, the guide gets a new version from there. The group sees which plants close with a cause and which still work from memory — and that is the standard worth managing.

  • The draft comes from the closure, in the plant that did the work
  • Approved once, by a named person; versioned and superseded, never deleted
  • The group sees closure quality by plant and line, read from the record

The whole panel, for maintenance managers

Control room

All locations · last 12 months

Incidents in the period

Corrective work orders, per month

34

corrective — 5 in the last month, the most of the year

AugJul

Corrective vs preventive

How much of the work was planned

38 %

planned — 21 preventive against 34 corrective

By line

  • Line 2 · Berlin31
  • Line 1 · Berlin14
  • Line 3 · Munich7
  • Line 1 · Lyon3

Both from the work orders the CMMS already holds. Open incidents do not depend on the period: they are open today.

Where the line is today

Norlan does not translate, and does not rank plants.

Technicians write in their own words and Norlan tidies them, but there is no automatic translation between sites in different languages yet. There is no network with other companies' plants: a fix travels to the group's other sites and to nobody else's. And there is no league table of sites — closure quality is shown so a manager can act on a line, not so one plant can be ranked against another.

What Norlan connects to, with the state of each one

Questions about several sites

Our sites run the same model but not the same configuration. Does that break it?

It is the normal case, and it is why the exception lives on the unit. The model carries what is common — the manual, the parts list, the guides, the validated causes — and each unit carries what is only true for it: the retrofit, the line it runs on, the speed it runs at. When a fault is on the model, every site benefits; when it is on the configuration, only the units with that configuration are told.

Does one plant write the standard for the others?

No, and neither does a central team. The plant that solved the failure is the one whose closure becomes the draft guide, because that is where the knowledge is; next time it may be another plant, and the guide gets its new version from there. Whoever leads maintenance approves it — a group role or a plant role, as the group decides — and every plant receives the same versioned guide with the author's name. What the group gets is visibility: which plants close incidents with a cause and a verified fix, and which still rely on memory.

Do our plants see each other's threads?

Access is by group and by asset, and each plant decides it. What travels between sites by default is what is attached to the model: guides, field notes and validated causes, cited by the assistant wherever a unit of that model is asked. Whether a technician in Lyon can open the full thread of the Berlin incident is a permission the plant sets, per group, and can revoke.

Our sites work in different languages. Does that work?

Not across languages yet. Within a site, technicians write and dictate in their own words and Norlan tidies them; between sites in different languages there is no automatic translation today, and we would rather say so than have it discovered in the second plant. If that is the first thing a rollout needs, it is worth raising on the call: we will say exactly where it stands.

How disruptive is deployment?

Deliberately not. The installed base is imported from the ERP or CMMS as a tree of locations, the document library goes in as it is, and Norlan proposes which documents belong to which models. It starts on one site and one workflow.

Book a demo

Bring a model that runs in more than one plant. We will show what the sites could already be sharing.

We start with the operation — which failures repeat, who gets called when something breaks, what the CMMS does not hold — and then show how Norlan would work on it.

What we usually cover

  • How an incident flows today, from detection to fix
  • Where the conversation actually happens: the systems, or calls and WhatsApp
  • What takes longer — the diagnosis, or getting the right people and information together
  • How much of what a technician knows is written down, and what happens when they are away
  • Which tools are really in play: CMMS, ERP, mobile, paper
  • What a pilot would measure, and how

Pick a time that suits the plant. Bring one failure that keeps coming back.

The call is with the people who build the product, with no qualification call first. Norlan is pre-general-availability and shaped with maintenance teams in pharma and food processing.